Infrastructure Map

Pipeline networks, terminals, and processing facilities

Crude Takeaway

4.2M

Bbl/day capacity

Gas Takeaway

18.5

Bcf/day capacity

Avg Utilization

79%

+5% vs last month

Active Bottlenecks

2

Impacting basis

Infrastructure Network

Crude
Gas
Terminal
Plant

Major Pipelines

Permian Highway

Kinder MorganNatural Gas

operational
87%

Capacity: 2.1 Bcf/d

EPIC Crude

EPIC MidstreamCrude Oil

operational
72%

Capacity: 600 MBbl/d

Cactus II

Plains All AmericanCrude Oil

operational
91%

Capacity: 670 MBbl/d

Gray Oak

Gray Oak PipelineCrude Oil

operational
68%

Capacity: 900 MBbl/d

Whistler

WhiteWaterNatural Gas

operational
78%

Capacity: 2.0 Bcf/d

Terminals & Hubs

Cushing Hub

Cushing, OKStorage

76M BBL
54%

Houston Ship Channel

Houston, TXExport Terminal

2.5M Bbl/d
82%

Corpus Christi Terminal

Corpus Christi, TXExport Terminal

1.8M Bbl/d
76%

Wink Hub

Wink, TXInterconnect

3.2M Bbl/d
89%

Active Bottlenecks

SegmentIssueImpactBasis EffectRecommendation
Midland to CushingPipeline CapacityHigh+$1.25Consider Cactus II allocation
Waha HubGas TakeawayMedium-$0.45Monitor Permian Highway expansion