Infrastructure Map
Pipeline networks, terminals, and processing facilities
Crude Takeaway
4.2M
Bbl/day capacity
Gas Takeaway
18.5
Bcf/day capacity
Avg Utilization
79%
+5% vs last month
Active Bottlenecks
2
Impacting basis
Infrastructure Network
Crude
Gas
Terminal
Plant
Major Pipelines
Permian Highway
Kinder Morgan • Natural Gas
87%
Capacity: 2.1 Bcf/d
EPIC Crude
EPIC Midstream • Crude Oil
72%
Capacity: 600 MBbl/d
Cactus II
Plains All American • Crude Oil
91%
Capacity: 670 MBbl/d
Gray Oak
Gray Oak Pipeline • Crude Oil
68%
Capacity: 900 MBbl/d
Whistler
WhiteWater • Natural Gas
78%
Capacity: 2.0 Bcf/d
Terminals & Hubs
Cushing Hub
Cushing, OK • Storage
54%
Houston Ship Channel
Houston, TX • Export Terminal
82%
Corpus Christi Terminal
Corpus Christi, TX • Export Terminal
76%
Wink Hub
Wink, TX • Interconnect
89%
Active Bottlenecks
| Segment | Issue | Impact | Basis Effect | Recommendation |
|---|---|---|---|---|
| Midland to Cushing | Pipeline Capacity | High | +$1.25 | Consider Cactus II allocation |
| Waha Hub | Gas Takeaway | Medium | -$0.45 | Monitor Permian Highway expansion |